Invall
CA | ES | EN

TRUCA’NS
977 128 414

Invall - Empresa

The railways projects

Our collaboration with the Business Association and chemistry of Tarragona (AEQT in Catalan) to connect various areas in the rail infrastructure has allowed us to acquire extensive experience in the preparation of studies of the rail route. We determine the optimum route of via, as well as the study necessary, measurements and calculations to avoid conditions unattainable for the contracting organization.

We highlight the connections of the petrochemical polygon of Tarragona with the Tarragona-Valencia and Tarragona-Reus and logistic terminals connections of BASF and BAYER

Principals treballs realitzats

Study to evaluate the feasibility of passing a railroad freight route to the stream of BASF until December Baorada installation TTPP REPSOL Oil.

AEQT

Study to evaluate the feasibility of passing a railroad freight at the Port of Tarragona following the route of the road from Vila-Seca to La Pineda to the boundary of the area Zal of the Port of Tarragona La Pineda.

AEQT

We studied railway line and connect different areas by rail.