Construction and technical supervision is the one that has made AVALL in six wind farms in the province of Teruel, in addition to three substations and two 220 KV evacuation lines.
Construction and technical supervision is the one that has made AVALL in six wind farms in the province of Teruel, in addition to three substations and two 220 KV evacuation lines.